Yazhou Bay Nanfan General Hospital, Sanya, Hainan
General contractor: China Construction Fifth Engineering Bureau
Construction area: 20,500 ㎡
Nimova's plastic modular formwork is used in the main vertical structures of the medical technology building, outpatient building, and administrative building. Floor slabs are precast concrete.
